Completion of MRS Building Federal Neuro Psychiatric Hospital for Total E&P Nig Limited
Complete all the finishes of the building • Repair of the existing roof • Execute the external works within the premises of the building | Completed August 2014
Self Drained, Sound and Waterproof Portacabins for Association Francaise de Nigeria
Developed detailed specifications for the architectural drawings • Production of structural design • Production of detailed fabrication drawings • Review electrical drawings and production of mechanical/plumbing drawings • Onsite fabrication of the portacabins using steel members • Electrical and mechanical installations | Completed November 2014
Revamping of Paradise Building for Total E&P Nig Limited
General civil works of the entire buildings - Internal and external | Completed April 2012
Pension Fund Car park for Total E&P Nig Ltd
Site preparation and restoration works for a proposed car park | Completed September 2011
Compound and Roof Renovation Works for French Embassy
• Engineering studies of the existing roofing system and plumbing system with in the premises • Demolition of existing penthouse on the building and reinforcing of same • Removal of the existing roof coverings and installation of new ones • Revamping of the plumbing systems within the compound | Completed August 2012
Offshore Reroofing of Ilado Diversity Center for Total E&P Nig Limited
Reroofing of the Ilado Diversity Center; revamping of all wood works and metal works within the diversity hall | Completed August 2014
Revamping of Knorr House BQ for Total E&P Nig Ltd
We handled the general civil works of the entire building - Internal and external
Revamping of Ilu Drive for Total E&P Nigeria Ltd
The project involved general civil works of the buildings – Internal and external and construction of drainages for the entire premises | Completed April 2012
Revamping of the Heritage Bank Training School
The project involved general civil works, total revamping of the mechanical and electrical of the building and external works of the entire premises | Completed September 2013
Design, Fabrication and Installation of Fire Escape Staircase and Ramp for Total Deepwater
The project was a revamping work and our roles were: detailed architectural drawings for the fire escape staircase; production of structural design, detailed fabrication drawings and onsite fabrication of the portacabins using steel members | Completed October 2010
Revamping of Egina Library for Total E&P Nig Limited
Our Role: General civil works of the entire buildings - Internal and external | Completed October 2010
French School Apartment for Association Francaise de Nigeria
The project was a design and built contract and our roles include: demolition and erection of new walls and other civil related works; electrical and mechanical installations for the portacabins; interior furniture/finishing of the apartment | Completed January 2010